Factory Planning


back to: Logistics

Not every factory is built on untouched fields anymore, and not every object can be planned without tight constraints on time and space. The tracks are laid for the functionality and effectiveness of an object already in the planning phase. The objective of b.i.g. Engineering is to achieve not only the operational goals in factory planning, but also to realise a technically perfect and efficient sequence of production processes under suitable working conditions. The main objectives in   b.i.g. – factory planning are:

  • Suitable infrastructure planning
  • Optimal flow of information and materials
  • Short through-put times
  • Suitable workplace design
  • Good use of area and space as well as
  • High flexibility in the buildings, plants and facilities
  • Cost-conscious planning and arrangement of all trades

 